The Hidden Water Systems That Keep Cities Alive

FIELD NOTES No. 030 · PART 1
Published: 22 July 2026

What Most People Never See Beneath Everyday Urban Life

The City We See and the Systems We Do Not

Visitors arriving in Phnom Penh usually notice the visible city first.

The Royal Palace, the Mekong and Tonlé Sap rivers, new apartment towers, shopping centres, hotels, construction cranes and increasingly busy roads tell an obvious story of urban growth.

I noticed those things too.

But years of visiting construction sites, industrial facilities, water-treatment plants and government offices in Cambodia gradually changed what I look for when I enter a city.

I began paying more attention to the infrastructure that does not appear in the skyline.

Somewhere outside public view, raw water is being drawn from a river and treated. Pumps move it into transmission mains. Reservoirs and distribution networks maintain supply across neighbourhoods. Pressure has to be managed. Water quality is tested. Broken pipes are repaired, and meters record consumption.

After that water has been used, another system begins.

Wastewater has to be collected. Stormwater needs somewhere to go when heavy rain falls. Pumping stations, drainage channels, sewers and treatment facilities have to work together well enough that a normal rainstorm does not become an urban emergency.

People rarely think about any of this while the systems are working.

That is precisely why these systems deserve more attention from governments before they begin to fail.

Phnom Penh skyline overlooking the Mekong and Tonlé Sap Rivers.
Photo Source: allPhoto Bangkok. Source credit retained from the original post.

Urban Growth Multiplies Water Demand Quietly

A city does not need a water crisis to place its system under pressure.

Ordinary economic growth can do it.

Every new apartment building adds hundreds of taps, showers and toilets. A hotel may require water around the clock. A hospital needs reliable supply and predictable quality. Restaurants, schools, offices and shopping centres add another layer of demand.

Then industry enters the calculation.

Factories may need process water, cooling water, cleaning water and fire-protection reserves. Construction itself consumes water. Commercial developments generate wastewater as soon as they begin operating.

This means a city can add significant demand even when population growth alone appears manageable.

Phnom Penh Water Supply Authority has had to respond to exactly this problem. Rapid urbanisation and construction increased demand to the point that major new production capacity became necessary.

The Bakheng Water Production Facilities became one of the central responses.

Phase 1 began operating in 2023 with production capacity of 195,000 cubic metres per day. Phase 2 added another 195,000 cubic metres per day and was officially inaugurated in June 2024.

Those two phases alone provide 390,000 cubic metres of additional daily production capacity.

Phase 3, now under development, is planned to add another 195,000 cubic metres per day by 2027.

The numbers are large because the city around the system is also changing quickly.

This is one reason urban water planning cannot simply respond to today's population. It must anticipate the city that will exist when a project finally enters operation.

Producing Water Is Only the Beginning

A water-treatment plant receives attention because it is large, visible and expensive.

The water still has to reach the customer.

That requires transmission mains, distribution networks, valves, reservoirs, pumping stations and pressure-management zones spread across the city.

A treatment plant can theoretically produce enough water while residents at the edge of the network still experience weak pressure or intermittent supply because the distribution system has not kept pace.

This is why the Bakheng programme has included major network expansion as well as treatment capacity.

PPWSA's planning for the three Bakheng phases includes substantial transmission and distribution-main development. Phase 3 alone is associated with approximately 51 kilometres of transmission main and around 750 kilometres of distribution main in PPWSA's published plans.

That distinction matters for policymakers.

When a city says it needs more water, the problem may be the source. It may be treatment capacity. It may also be transmission, storage, pressure or leakage.

Building additional production without identifying the actual bottleneck can create an expensive asset whose capacity cannot be fully used.

The Network Has to Be Managed, Not Merely Buried

Once pipelines disappear beneath roads, they become easy to forget.

They should not.

Water networks age. Joints fail. Ground movement creates stress. Construction work can damage pipes. Valves stop operating properly, meters become inaccurate and pressure that is unnecessarily high can increase leakage.

Every utility therefore has to distinguish between the water it produces and the water for which it receives legitimate revenue.

The difference is generally discussed as non-revenue water.

Some losses are physical leakage. Others come from meter problems, unauthorised connections or weaknesses in billing and records.

Phnom Penh's water utility became internationally recognised in part because it treated this as a management issue rather than simply a pipe-replacement programme. ADB has subsequently incorporated lessons from PPWSA into provincial Cambodian water projects, including dedicated attention to non-revenue-water reduction and stronger utility management.

The lesson is relevant well beyond Cambodia.

A government searching for another reservoir or treatment plant should first understand how efficiently the water already being produced is being delivered and accounted for.

Sometimes the cheapest new source of water is water the utility has already treated but is currently losing.

Water-supply and wastewater infrastructure serving Phnom Penh.
Source: Cambodia News Briefing, April 4, 2023. Source credit retained from the original post.

Water Supply and Wastewater Are Two Halves of the Same City

Supplying more water creates another responsibility that is sometimes overlooked.

Most of that water eventually becomes wastewater.

If a city expands drinking-water supply without expanding sewerage and wastewater-treatment capacity, the improvement on one side of the system can increase pressure on the other.

This is especially important as Phnom Penh becomes denser.

More apartment buildings, restaurants, offices, hotels and commercial facilities mean larger wastewater volumes concentrated into the same urban area.

Historically, Phnom Penh's water-supply development advanced much more rapidly than its centralised sewerage and wastewater-treatment infrastructure.

An important change occurred in November 2023, when the Cheung Aek Sewage Treatment Plant began operation.

JICA describes it as Phnom Penh's first wastewater-treatment plant. The facility was developed as part of a Japanese grant-aid sewerage project and has treatment capacity of approximately 5,000 cubic metres per day, serving wastewater generated by an estimated 19,000 people.

In a capital of Phnom Penh's scale, that capacity is clearly a beginning rather than the final system.

That does not reduce its significance.

The project establishes treatment experience, operating knowledge and a technical platform from which much larger sanitation infrastructure can eventually develop.

Wastewater Infrastructure Is More Than the Treatment Plant

There is another reason wastewater projects can be misunderstood.

A treatment plant can process only the wastewater that reaches it.

That requires sewer networks, interceptors, pumping facilities and household or commercial connections. Existing drainage systems may have been designed primarily to remove stormwater rather than to carry sewage to modern treatment facilities.

The result is a much more complicated urban engineering problem than constructing a plant at one location.

Government has to understand catchment areas.

Which neighbourhoods are connected? How will wastewater reach the interceptor? Are stormwater and sewage separated or combined in parts of the network? What happens when heavy rain suddenly increases flow? Which new development areas should be required to connect?

These decisions determine how much of the treatment capacity actually produces environmental benefit.

This is why cities should plan sewer networks and treatment facilities together.

Drainage Has Become a Development Constraint of Its Own

Phnom Penh's rapid development creates another water problem that has nothing to do with drinking-water supply.

Rain has to leave the city.

As urban development expands, natural ground is replaced by buildings, roads, parking areas and other hard surfaces. Rainfall that once infiltrated into soil reaches drains much more quickly.

If drainage capacity does not expand at roughly the same pace, the city becomes more vulnerable to local flooding.

JICA noted this problem explicitly in 2026 when Japan and Cambodia signed a new ODA loan agreement for the Flood Protection and Drainage Improvement Project in Phnom Penh.

The agency reported that flooding in the capital has become more widespread and prolonged amid heavy rainfall associated with climate change and insufficient drainage infrastructure.

This should concern economic planners as much as municipal engineers.

Urban flooding disrupts traffic. Businesses close temporarily. Ground floors and warehouses are damaged. Water can enter electrical systems. Contaminated floodwater creates public-health risks, and recurring inundation can reduce the value and attractiveness of entire districts.

Drainage is therefore an economic service.

Its value is most obvious on the day a major storm arrives.

The City Needs Somewhere to Store Water Temporarily

Drainage is sometimes discussed as though larger pipes can solve every flooding problem.

They cannot.

A city also needs places where stormwater can be temporarily stored or slowed before it reaches downstream channels.

Lakes, wetlands, detention basins and open drainage corridors can perform this function. When urban development reduces these spaces, the engineered drainage network may be forced to carry much larger peak flows.

This creates a land-use question.

The land needed for future drainage may have little commercial value when a neighbourhood is sparsely developed. Ten years later, purchasing the same corridor through dense urban development can become extraordinarily expensive.

Water infrastructure planning therefore belongs inside urban planning.

Roads, land subdivision, building density, lakes, drains and utility corridors have to be considered before development makes the alternatives disappear.

Pumps Create a Direct Link Between Water and Electricity

Phnom Penh is relatively flat.

Water does not always move where a city needs it to go by gravity alone.

Pumps therefore appear throughout the urban water cycle.

Raw water may need pumping to a treatment facility. Treated water has to maintain adequate pressure in the network. Wastewater sometimes has to be lifted to reach a sewer or treatment facility. Stormwater pumping becomes critical when river levels or urban topography prevent drainage by gravity.

Every one of these systems depends on electricity.

This creates an operational risk that infrastructure planners need to recognise.

A pump station should not be evaluated only by its construction cost and pumping capacity. Engineers need to consider power reliability, backup arrangements, energy consumption, maintenance access, spare pumps and whether the responsible institution can afford the electricity bill year after year.

A water asset without reliable energy is only partially functional infrastructure.

Water Quality Depends on Laboratories as Much as Concrete

Bakheng Water Treatment Plant, Phnom Penh.
Photo Source: Aju Business Daily, June 20, 2023. Source credit retained from the original post.

A large treatment basin can create the impression that clean water is mainly the result of engineering structures.

The structures are essential.

So are the people taking samples and reading instruments.

Raw-water quality changes. Chemical dosing has to respond. Turbidity and microbiological safety need monitoring. Problems in the network can affect water even after it has left the treatment plant.

A modern utility therefore needs laboratories, trained technicians, operating procedures and accurate records alongside pumps and filters.

This is one of the aspects of infrastructure that is easiest to underfund.

A donor or government can finance a new laboratory building and equipment. The harder obligation begins afterward: qualified staff, reagents, calibration, maintenance and routine testing must continue for the life of the system.

Water quality is a daily operating responsibility.

Maintenance Happens While the City Is Still Using the System

A road can sometimes be closed for reconstruction.

A city cannot easily stop drinking water for several weeks while its network is repaired.

That makes maintenance planning more demanding.

Pumps need standby units. Treatment trains may require redundancy so one section can be taken out of service. Utilities need valves that allow a damaged pipe segment to be isolated without cutting supply to an entire district.

Critical spare parts must be available before equipment fails.

The same principle applies to sewerage and drainage.

Sediment has to be removed from drains before the rainy season. Pumps should be tested before the storm arrives. Blockages need to be identified while they are still maintenance problems rather than flood emergencies.

This kind of work rarely appears in an opening ceremony.

It determines whether the infrastructure continues to work several years afterward.

A City's Water System Is Really an Asset Portfolio

One difficulty for governments is that urban water infrastructure is not one asset.

It may contain thousands of kilometres of pipe, hundreds of valves, pumps of different ages, treatment facilities, reservoirs, electrical systems, meters, laboratories, drains, sewers and structures built in different decades.

Managing that network requires an asset register.

The responsible organisation should know what it owns, where the asset is located, when it was installed, its condition, maintenance history and expected replacement period.

Without that information, budgeting becomes reactive.

Whichever pump fails receives attention. Whichever pipe bursts is replaced. A drainage channel is cleaned after flooding rather than because inspection showed that sediment had already reduced capacity.

Asset management changes the sequence.

It allows a utility or city government to identify vulnerable assets before failure and allocate limited maintenance budgets according to risk.

This becomes more important every year as Phnom Penh's infrastructure stock grows.

Technology Can Help — If Someone Acts on the Information

Water infrastructure is increasingly digital.

Flow meters can reveal changes between zones. Pressure sensors can identify unusual operating conditions. Supervisory control systems allow treatment and pumping facilities to be monitored centrally. Geographic information systems can locate underground assets, and smart meters can provide better consumption data.

Leak-detection systems can narrow the search area when water losses increase.

These tools can improve performance substantially.

They do not eliminate the need for maintenance teams, operators and engineers.

A sensor identifying abnormal pressure creates value only when somebody investigates the cause. A digital map becomes unreliable if repairs are made without updating the asset record. A dashboard showing pump vibration is useful only if a maintenance programme can respond before failure.

The important investment is therefore not simply digital technology.

It is the operating system around the technology.

The Hidden Workforce Matters as Much as the Hidden Pipes

After visiting water facilities in different countries, one thing has stayed with me.

Reliable service depends on a surprisingly large number of routine decisions.

An operator notices a change in turbidity. A laboratory technician confirms a result. A maintenance team replaces a bearing. An engineer adjusts pressure in one distribution zone. A worker cleans a drainage channel before rainfall begins.

None of these decisions is dramatic.

Combined, they determine whether millions of people experience a normal day.

This creates a human-capital requirement that should be planned alongside construction.

Cities need water engineers, electrical and mechanical technicians, laboratory specialists, network crews, sewer operators, drainage personnel and asset managers.

If a new treatment plant introduces technology that the local operating organisation cannot maintain independently, the project remains partly dependent on the contractor long after construction.

Training and knowledge transfer should therefore be specified as project deliverables rather than treated as an informal benefit of working beside foreign engineers.

What a City Should Monitor Before Residents Notice a Problem

Senior officials do not need to read every operating report, but they should have a small set of indicators that reveal whether the hidden system is deteriorating.

Water supply reliability Hours of continuous service, low-pressure areas and recurring interruptions show whether customers are receiving the service the system was designed to provide.
Non-revenue water Rising losses may indicate leakage, meter problems or weaknesses in customer and billing management.
Water-quality compliance Treatment-plant performance and network sampling should confirm that quantity is not being achieved at the expense of safety.
Remaining production capacity Demand growth should be compared with reliable production and transmission capacity several years before the next expansion is required.
Wastewater collected and treated Treatment capacity alone is insufficient; government should know how much urban wastewater actually reaches compliant treatment.
Drainage performance Recurring flood locations, drainage duration and blocked or undersized assets reveal where urban growth has exceeded system capacity.
Critical asset condition Major pumps, electrical equipment, treatment processes and trunk mains should be ranked by failure risk and replacement need.
Maintenance backlog A growing backlog is an early warning that the operating organisation is receiving less money or capacity than the expanding infrastructure network requires.

The Budget Should Follow the Asset, Not End at Construction

Many infrastructure programmes are easier to finance during construction than during operation.

A development partner may provide a concessional loan or grant for a treatment plant. An international contractor constructs the facility. Equipment arrives under the project budget.

Then the project closes.

From that point onward, the operating institution must pay salaries, electricity, chemicals, spare parts, laboratory costs and maintenance.

Eventually major mechanical and electrical equipment needs replacement.

Drainage and sewer networks require cleaning. Old distribution pipes need rehabilitation. New development areas demand network extension.

Those are recurrent obligations.

This is why capital budgeting and maintenance budgeting should be connected from the beginning.

When government approves a new infrastructure asset, it should also know the approximate annual cost of keeping it operational and which institution will carry that cost.

Otherwise a successful construction programme can slowly create a maintenance problem larger than the responsible agency's budget.

Growth Should Trigger Infrastructure Reviews Automatically

Phnom Penh will continue to change.

The useful question is how infrastructure planning keeps pace without waiting for each problem to become severe.

One approach is to connect major urban-development approvals to water-infrastructure capacity reviews.

If a large new satellite development is approved, planners should examine drinking-water demand, wastewater generation and drainage simultaneously.

If industrial development accelerates in a corridor, the utility should update demand projections before the existing network reaches its limit.

If repeated flooding appears in a district, land-use approvals and drainage capacity should be reviewed together rather than treating every flood as an isolated maintenance event.

This creates a feedback loop between urban growth and infrastructure planning.

The alternative is familiar in many fast-growing cities: buildings arrive first, followed by emergency efforts to retrofit the infrastructure underneath them.

What I See Differently Now

When I first began paying attention to infrastructure, large structures naturally attracted my interest.

They still do.

But a city's reliability is often determined elsewhere.

It is in the transmission main beneath the road, the pump that starts during a storm, the operator checking treatment conditions at night, the sewer interceptor carrying wastewater away from a neighbourhood and the maintenance budget that replaces equipment before failure.

Phnom Penh's expansion of drinking-water capacity through Bakheng is an important achievement. Its emerging wastewater-treatment system is another step, while continuing investment in drainage shows that a rapidly growing capital has to manage several water challenges at the same time.

None can be planned entirely on its own.

More water supply creates more wastewater. Urban expansion changes runoff. New pipes and plants create future maintenance obligations. Digital equipment creates a need for different technical skills.

This is what makes urban infrastructure a system rather than a collection of projects.

From the skyline, almost none of it can be seen.

At street level, every resident depends on it.

Sources and Further Reading

Phnom Penh Water Supply Authority — Bakheng Water Production Facilities Phase 2
Official Inauguration of Bakheng Phase 2
Official PPWSA information on the 195,000 m³/day Phase 2 facility inaugurated in June 2024.

Phnom Penh Water Supply Authority — Bakheng Water Production Facilities Phase 3
Construction of Bakheng Water Treatment Plant Phase 3
Provides official information on the additional 195,000 m³/day Phase 3 project scheduled for completion in 2027.

Agence Française de Développement — Bakheng Water Treatment Project
Bakheng Water Production Facilities Phase 1
Reviews the first 195,000 m³/day phase and its role in expanding reliable water supply in Phnom Penh and Ta Khmau.

Japan International Cooperation Agency — Phnom Penh Wastewater Treatment
Phnom Penh Wastewater Treatment Begins
Describes commissioning of Phnom Penh's first wastewater-treatment plant in November 2023 with treatment capacity of 5,000 m³/day.

Japan International Cooperation Agency — Flood Protection and Drainage Improvement Project in Phnom Penh
2026 Phnom Penh Drainage Improvement ODA Loan
Explains the new investment in drainage and flood protection as Phnom Penh faces increasing urban flood risk.

Asian Development Bank — Cambodia Urban Water Supply Project
Cambodia Urban Water Supply Project
Reviews expansion of water service in provincial towns and operational improvements based partly on lessons from PPWSA, including non-revenue-water management.

Asian Development Bank — Phnom Penh Water Supply Authority Reform
PPWSA Internal Reforms and Performance
A case study of the institutional and operational reforms that transformed Phnom Penh's public water utility.


Related Articles

→ Why Water Infrastructure Will Shape Cambodia’s Economic Growth

→ When Wastewater Is Left Untreated, the Public Pays


Peter Kwon
GLOBAL INSIGHT 365
Independent perspectives on infrastructure, development and a changing world.

© 2026 Peter Kwon. All Rights Reserved.

Comments

  1. 캄보디아에 관해서 더 많은 걸 배우게 됩니다.

    ReplyDelete
    Replies
    1. 조용하지만 꾸준히 발전하는 기회가 있는 나라입니다. 감사합니다

      Delete
    2. 정말 감사합니다. 캄보디아는 역동적인 희망을 현실로 이루어나가는 나라입니다

      Delete
  2. 캄보디아에 관해 알려주셔서 감사합니다.

    ReplyDelete

Post a Comment

Welcome to Global Insight 365.

We value thoughtful discussions and diverse perspectives.

Please share your ideas with respect and kindness.

Together, we build a trusted global knowledge
community.
Global Insight 365에 오신 것을 환영합니다.

우리는 깊이 있는 토론과 다양한 관점을 소중히 생각합니다.

서로를 존중하는 마음으로 여러분의 생각을 나누어 주세요.

함께 신뢰받는 글로벌 지식 공동체를 만들어 갑시다.

Popular posts from this blog

Nigeria Beyond Abuja

How Artificial Intelligence Is Transforming Global Infrastructure